Plan for use strategy
The RIBA Plan of Work published by the RIBA in 2020 suggests that:
Plan for Use is the RIBA’s interpretation of the Soft Landings Framework produced by the Usable Buildings Trust and BSRIA. Its aim is to encourage a more outcome-based approach to briefing, design, construction, handover and aftercare throughout the construction industry. The Plan for Use Strategy is central to this focal shift. Plan for Use has three basic components:
|
Additional guidance can be found in the RIBA Plan for Use Guide (2020), created for the 2020 version of the RIBA Plan of Work.
Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, states:
‘Plan for Use is the RIBA’s interpretation of the Soft Landings Framework produced by the Usable Buildings Trust and the Building Services Research and Information Association (BSRIA) and is embedded within the 2020 RIBA Plan of Work. Its aim is to encourage a more outcome-based approach to briefing, design, construction, handover and aftercare throughout the construction industry. This is a key element of the design and construction process and maintaining the “golden thread” of the building purpose through to delivery and operation, with early engagement of the end user and inclusion of a Plan for Use champion on the project team, and commitment to aftercare post construction. BS8536 Design and construction for operability also offers guidance on this.’ |
Engagement Overlay to the RIBA Plan of Work, published by the RIBA in January 2024, states:
The Plan for Use Strategy should include an asset's operation and management, ensuring it is looked after appropriately in perpetuity. The Plan for Use Strategy may include land to be held for the benefit of the community (this can also be referred to as stewardship) and capture how contributions will be guaranteed for long-term management purposes, or management and maintenance of communal spaces (internal or external) and including provision for roads and footways that fall outside the adoption strategy.
There are various legal models and approaches. It involves creating a plan to ensure that the development meets the needs and expectations of the planning consent, the users and the community over the long term, including responding to any unforeseen issues that may arise – also, gathering feedback, ensuring that their needs and addressing concerns, and ensuring that the development is sustainable and adaptable to future changes. Involving the community and users of the asset(s) helps build trust, nurture community involvement, and foster a sense of ownership. It can provide opportunities for innovation, potential upskilling, and education, enabling community members and potential participation of existing local community groups to improve the quality of their environment. |
The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states:
Plan for Use is the RIBA’s interpretation of the Soft Landings Framework produced by the Usable Buildings Trust and BSRIA and is embedded within the 2020 RIBA Plan of Work. Its aim is to encourage a more outcome-based approach to briefing, design, construction, handover and aftercare throughout the construction industry. |
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February